§ 30.60.080. Special Regulations.
A.
Unless otherwise exempted by this Chapter, no building, improvement, structure, or portion thereof shall be erected, constructed, converted, established, altered or enlarged, nor shall any lot or premises be excavated or graded unless a Conditional Use Permit is first obtained in accordance with the procedures set forth in this Code. Said Conditional Use Permit shall include, but not be limited to, provisions to assureconformity with the development criteria applicable to the property as described in the Open Space Element of the adopted Community Plan. If said element of the Community Plan so designates, the Planning Commission shall stay action on the Conditional Use Permit for a period of time necessary to enable residents of the area to attempt to form an assessment district for the purchase of such area. In no event shall the stay of action for such acquisition purposes exceed a one-year period from the time of filing the Conditional Use Permit application.
B.
A project involving the minor construction alteration, or remodeling of the exterior of a structure shall not be subject to the receipt of a Conditional Use Permit, provided:
1.
The proposed project involves the modification of an existing structure and the outer dimensions of such structure will not be extended by more than three feet;
2.
The project conforms with the development criteria applicable to the property as described in the Open Space Element of the adopted Community Plan; and
3.
The project receives all required design review approvals.
(Ord. No. 643)